.
Power Stress Test
Power Stress Test - Suspend
Build tested |
Tester |
Date |
Pass/Fail/Blocked |
Bug # |
Comment |
Suspend/Resume
- Suspend and resume the system 100 times, ensure system resumes properly, with all functionality
Power Stress Test - Hibernate
Build tested |
Tester |
Date |
Pass/Fail/Blocked |
Bug # |
Comment |
Hibernate/Resume
- Hibernate and resume the system 100 times, ensure system resumes properly, with all functionality