UNR-stress-power
.
Power Stress Test
Power Stress Test - Suspend
Build tested |
Tester |
Date |
Pass/Fail/Blocked |
Bug # |
Comment |
Suspend/Resume
- Suspend and resume the system 100 times, ensure system resumes properly, with all functionality
Power Stress Test - Hibernate
Build tested |
Tester |
Date |
Pass/Fail/Blocked |
Bug # |
Comment |
Hibernate/Resume
- Hibernate and resume the system 100 times, ensure system resumes properly, with all functionality
Testing/Cases/UNR-stress-power (last edited 2009-01-22 18:23:35 by bismuth)