SpecProcess

Differences between revisions 1 and 3 (spanning 2 versions)
Revision 1 as of 2005-04-27 03:12:30
Size: 2486
Editor: intern146
Comment: Initial submission for editing
Revision 3 as of 2005-04-27 05:56:29
Size: 4154
Editor: intern146
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
 * People: ColinCharlesQueue  * People: TollefFogHeenLead, ColinCharlesSecond, ["ColinCharlesQueue"]
Line 9: Line 9:
 * Interested:
 * Status: BrainDump, UbuntuSpecification, NewSpec
 * Interested: ["JaneW"], MattZimmerman
 * Status: DraftSpecification, UbuntuSpecification
Line 21: Line 21:
From a spec is "born" until it is accepted and implemented is a big and underdocumented process. Every specification should go through the life cycle as described in this specification. The process from the time a specification is "born" until it is accepted and implemented, is currently a large, mostly undefined and under-documented set of procedures. Every specification should go through the life cycle as described in this specification.
Line 25: Line 25:
As the Ubuntu community move to a more specification-based process, a specification for the process itself is needed so everybody knows what the process should work like. The current process is fragmented and people seem to be confused with regards to what the proper process is.  This causes excessive overhead and may cause specifications to be delayed unneededly. As the Ubuntu community moves towards a more specification-based process, a specification for the process itself is needed. This is so that everybody knows how the process should work. The current process is not yet mature, and is therefore still fragmented, for this reason it is confussing and is not being follwed in a standardised way. This has caused excessive overhead at the UDU conference and may cause specifications to be delayed unnecessarily.
Line 31: Line 31:
 * A new idea is proposed and goes through the full process. A new idea is proposed and goes through the full process.
 * The scope includes defining and documenting the proposed process (and/or procedures) for consideration, approval and ultimately implementation once approved.
Line 35: Line 36:
 * A new specification is made, based on the SpecSpec template.  * A new specification is created, based on the SpecSpec template.
Line 37: Line 38:
 * One or more BOFs are conducted. Discussion takes place.  * One or more BOF (discussion group) sessions are conducted. Here discussion takes place to explore ideas and firm up a direction for the topic at hand.
Line 39: Line 40:
 * The lead and/or second writes up the notes for the BOF. At this point the Status field should include "DraftSpec" and CommunitySpecification, DistroSpecification or LaunchPadSpecification. ColinCharlesQueue or SimonSharwoodQueue should be added to the list of People. They will review and edit the specification for clarity, spelling and grammar.  * The lead and/or second writes up the notes for the BOF. The '''BrainDump''' status is used in the Status field, to indicate that the brainstorming/discussion phase is still in progress.
Line 41: Line 42:
    * If the specification needs further cleanup, it will be sent back by the editors. This is done by adding "Queue" to the end of the name of the lead and the second along with comments on what changes are needed.  * Once the brain dump stage eveolves into more coherent and complete ideas, the Status field should be changed to '''"DraftSpec"''', and CommunitySpecification, DistroSpecification or LaunchPadSpecification should be added as appropriate to indicate which track the topic belongs to.
   It may also include "NewSpec" as a state. "ColinCharlesQueue or SimonSharwoodQueue" should be added to the list of People (yes, that's both of them). They will review and edit the specification for clarity, spelling and grammar.
Line 43: Line 45:
 * Once the lead and second are happy with the changes as they come back from the editors, they change the state to EditedSpecification and go to the Global room and move the post-it note.     * If the specification needs further clean-ups, it will be sent back by the specification editors. This is done by adding "Queue" to the end of the name of the lead and the second along with comments on what changes are needed. This could either be in the "comments" (this is limited to 80 characters), or kept within the document - this can be bolded, and placed in brackets.
Line 45: Line 47:
 * MattZimmerman or MarkShuttleworth then review the specification and move it to the ApprovedSpecification state by moving the post-it note and changing the state on the wiki.  * Once the lead and second are happy with the changes as they come back from the editors, the Editors change the state to '''EditedSpecification''' and the lead or second goes to the Global room to progress the post-it note to the appropriate section.
Line 47: Line 49:
 * The specification is implemented.  * Specifications which are ready to be submitted for approval should be placed in MattZimmerman or MarkShuttleworth's queues (by adding MattZimmermanQueue or MarkShuttleworthQueue to the people field). Matt / Mark will then will then review the specification and move it to the '''ApprovedSpecification''' state by moving the post-it note and changing the state on the wiki.
  It is a good idea to notify Matt or Mark in person of a spec is waiting on their approavl to avoid any unnessecary delays.
  Should the spec NOT be approved they will place it back in the queue of the person who sent it to them.

 * The specification is then queued for implementation. (Process to be defined for this later).

 * When the specification is implemented, it reaches a state of '''ImplementedSpecification'''.

SpecProcess

Status

Introduction

The process from the time a specification is "born" until it is accepted and implemented, is currently a large, mostly undefined and under-documented set of procedures. Every specification should go through the life cycle as described in this specification.

Rationale

As the Ubuntu community moves towards a more specification-based process, a specification for the process itself is needed. This is so that everybody knows how the process should work. The current process is not yet mature, and is therefore still fragmented, for this reason it is confussing and is not being follwed in a standardised way. This has caused excessive overhead at the UDU conference and may cause specifications to be delayed unnecessarily.

Scope and Use Cases

The implementation of a spec is out of scope at this point.

A new idea is proposed and goes through the full process.

  • The scope includes defining and documenting the proposed process (and/or procedures) for consideration, approval and ultimately implementation once approved.

Implementation Plan

  • A new specification is created, based on the SpecSpec template.

  • One or more BOF (discussion group) sessions are conducted. Here discussion takes place to explore ideas and firm up a direction for the topic at hand.
  • The lead and/or second writes up the notes for the BOF. The BrainDump status is used in the Status field, to indicate that the brainstorming/discussion phase is still in progress.

  • Once the brain dump stage eveolves into more coherent and complete ideas, the Status field should be changed to "DraftSpec", and CommunitySpecification, DistroSpecification or LaunchPadSpecification should be added as appropriate to indicate which track the topic belongs to.

    • It may also include "NewSpec" as a state. "ColinCharlesQueue or SimonSharwoodQueue" should be added to the list of People (yes, that's both of them). They will review and edit the specification for clarity, spelling and grammar.

      • If the specification needs further clean-ups, it will be sent back by the specification editors. This is done by adding "Queue" to the end of the name of the lead and the second along with comments on what changes are needed. This could either be in the "comments" (this is limited to 80 characters), or kept within the document - this can be bolded, and placed in brackets.
  • Once the lead and second are happy with the changes as they come back from the editors, the Editors change the state to EditedSpecification and the lead or second goes to the Global room to progress the post-it note to the appropriate section.

  • Specifications which are ready to be submitted for approval should be placed in MattZimmerman or MarkShuttleworth's queues (by adding MattZimmermanQueue or MarkShuttleworthQueue to the people field). Matt / Mark will then will then review the specification and move it to the ApprovedSpecification state by moving the post-it note and changing the state on the wiki.

    • It is a good idea to notify Matt or Mark in person of a spec is waiting on their approavl to avoid any unnessecary delays. Should the spec NOT be approved they will place it back in the queue of the person who sent it to them.
  • The specification is then queued for implementation. (Process to be defined for this later).
  • When the specification is implemented, it reaches a state of ImplementedSpecification.

Data Preservation and Migration

N/A

Packages Affected

N/A

User Interface Requirements

Using the wiki.

Outstanding Issues

UDU BOF Agenda

UDU Pre-Work

SpecProcess (last edited 2008-08-06 16:39:29 by localhost)