''This is an incomplete DRAFT.''

To be carried out by: nominated stable release manager, with support from the [https://launchpad.net/~ubuntu-sru stable release updates] and [https://launchpad.net/~ubuntu-release release teams]
To be carried out by: nominated stable release manager, with support from the [[https://launchpad.net/~ubuntu-sru|stable release updates]] and [[https://launchpad.net/~ubuntu-release|release]] teams
Line 10: Line 8:
Planning stages, for LTS point releases:
 1. Discuss candidates for new or improved hardware support with affected parties, including the Canonical support team (via Steve George) and the Ubuntu kernel team.
 1. Establish a hit-list of bugs to fix in the point release.
Between Release minus 6 months and Release minus 2 months:
 1. Discuss candidates for new or improved hardware support with affected parties. Some sources for this work should be:
  *
the Canonical support team (via Steve George)
  * customers
  *
the Ubuntu kernel team
  * the Ubuntu QA team

 1. Establish a hit-list of bugs to fix in the point release using a milestone.  Milestoning bugs is not a commitment to including the changes in the point release; they may be deferred after further information becomes available.
Line 14: Line 16:

Release minus 2 months:
 1. Process stable release updates [[StableReleaseUpdates|as normal]]. For hardware-enabling fixes, the package should be tested on the affected hardware prior to submitting to sign-off for -proposed.
Line 17: Line 22:
Process stable release updates [:StableReleaseUpdates:as normal]. Once an acceptable number of bugs is believed to be fixed, start building test CD images:
 1. If the kernel or associated modules has been changed, upload `debian-installer` after all the binaries are in place. If the ABI changed, make sure to take account of this throughout `debian-installer/build/config/` and in the `installer` seed for all flavours being built.
Release minus 1 month:

 1. In coordination with QA, verify that all candidate bugs are fixed.
 1. Upload a new `base-files` package to -proposed to bump the `lsb_release` description ([[http://changelogs.ubuntu.com/changelogs/pool/main/b/base-files/base-files_4.0.1ubuntu5.8.04.8/changelog|example for 8.04.4]]). Do not change the DISTRIB_RELEASE value, which is used programmatically by third-party software.
 1. If the kernel or associated modules have been changed, upload `debian-installer` after all the binaries are in place. If the ABI changed, make sure to take account of this throughout `debian-installer/build/config/` and in the `installer` seed for all flavours being built.
 1. Notify Evan Dandrea to update umenu and wubi for the point release.
Line 20: Line 29:
 1. Change `cdimage/bin/run-germinate` and `debian-cd/CONF.sh` to build from -proposed temporarily. If live CDs need to be built, also modify `cdimage/bin/buildlive`.
 1. Build CD
images (which will be published and smoke-test in some convenient environment to check for obvious failures.
 1. Contact IS, QA, and/or certification as appropriate to request testing.
 1. Once testing is verified to be complete, release images as final, and move the previous images to `old-releases.ubuntu.com`. TODO much more detail here
 1. Change `cdimage/bin/run-germinate` and `debian-cd/CONF.sh` to build from -proposed temporarily.
 1. Build
CD images (which will be published on cdimage.ubuntu.com) and smoke-test in some convenient environment to check for obvious failures.
Line 25: Line 32:
TODO:
 * actual release process
 * `lsb_release` et al?
 * Anything else?
Release minus 3 weeks:
 1. Contact IS, QA, and/or certification as appropriate to request testing for hardware recertification.
 1. Iterate CD images as needed based on testing feedback, in coordination with the kernel team.

Release minus 6 days:
 1. Once testing is verified to be complete, move packages to -updates.
 1. Prepare change summary and release announcement
  * script to use for preparing the change summary: http://people.canonical.com/~cjwatson/lucid-updates.py
  * if this is the final point release for the distroseries (because a new LTS will be released soon), include a reminder of this and of the support cycle/EOL.
 1. Notify Matthew Nuzum of the upcoming point release. Include detailed information about which image file names will change on the mirrors for the point release, and which ones will not.

Release:
 release images as final, and move the previous images to `old-releases.ubuntu.com`:
  * Check with James Troup whether the previous point release needs to be moved off before prepublishing due to mirror space constraints.
  * Prepublish images:
  
  {{{DIST=lucid for-project ubuntu publish-release ubuntu-server/daily 20100708 server poolonly}}}

  (similar for alternates, desktops, etc.)

  * TODO much more detail here
  * Notify Matthew Nuzum to update the iso URLs on the ubuntu.com website

 1. Create a snapshot of the archive:

 {{{lp_archive@cocoplum:~$ point-release-snapshot lucid lucid.1-security-updates-snapshot}}}

 which will create a hardlink farm in `~lp_archive/point-releases/`.

 1. File a bug on [[https://bugs.launchpad.net/ubuntu-website/+bugs|ubuntu-website]] to have https://help.ubuntu.com/community/UbuntuHashes updated.

 1. send the announcement mail

Release +1 day:

 1. restore the .manifest.full file on releases.ubuntu.com
----
CategoryProcess

To be carried out by: nominated stable release manager, with support from the stable release updates and release teams

Goals:

  • Refresh hardware support in LTS releases for carefully-selected hardware
  • Roll up accumulated stable updates into updated images to reduce download requirements for new deployments
  • Maintain stability of existing installations

Between Release minus 6 months and Release minus 2 months:

  1. Discuss candidates for new or improved hardware support with affected parties. Some sources for this work should be:
    • the Canonical support team (via Steve George)
    • customers
    • the Ubuntu kernel team
    • the Ubuntu QA team
  2. Establish a hit-list of bugs to fix in the point release using a milestone. Milestoning bugs is not a commitment to including the changes in the point release; they may be deferred after further information becomes available.
  3. In concert with affected developers, triage the hit-list for feasibility.

Release minus 2 months:

  1. Process stable release updates as normal. For hardware-enabling fixes, the package should be tested on the affected hardware prior to submitting to sign-off for -proposed.

  2. Discuss the possibility of a Canonical press release for the point release with Gerry Carr.
  3. Liaise with IS, QA, and certification to arrange for testing resources.

Release minus 1 month:

  1. In coordination with QA, verify that all candidate bugs are fixed.
  2. Upload a new base-files package to -proposed to bump the lsb_release description (example for 8.04.4). Do not change the DISTRIB_RELEASE value, which is used programmatically by third-party software.

  3. If the kernel or associated modules have been changed, upload debian-installer after all the binaries are in place. If the ABI changed, make sure to take account of this throughout debian-installer/build/config/ and in the installer seed for all flavours being built.

  4. Notify Evan Dandrea to update umenu and wubi for the point release.
  5. Change cdimage/bin/make-web-indices, cdimage/bin/publish-release, and debian-cd/CONF.sh to use the new release version number.

  6. Change cdimage/bin/run-germinate and debian-cd/CONF.sh to build from -proposed temporarily.

  7. Build CD images (which will be published on cdimage.ubuntu.com) and smoke-test in some convenient environment to check for obvious failures.

Release minus 3 weeks:

  1. Contact IS, QA, and/or certification as appropriate to request testing for hardware recertification.
  2. Iterate CD images as needed based on testing feedback, in coordination with the kernel team.

Release minus 6 days:

  1. Once testing is verified to be complete, move packages to -updates.
  2. Prepare change summary and release announcement
  3. Notify Matthew Nuzum of the upcoming point release. Include detailed information about which image file names will change on the mirrors for the point release, and which ones will not.

Release:

  • release images as final, and move the previous images to old-releases.ubuntu.com:

    • Check with James Troup whether the previous point release needs to be moved off before prepublishing due to mirror space constraints.
    • Prepublish images:

      DIST=lucid for-project ubuntu publish-release ubuntu-server/daily 20100708 server poolonly (similar for alternates, desktops, etc.)

    • TODO much more detail here
    • Notify Matthew Nuzum to update the iso URLs on the ubuntu.com website
  • Create a snapshot of the archive:

    lp_archive@cocoplum:~$ point-release-snapshot lucid lucid.1-security-updates-snapshot

    which will create a hardlink farm in ~lp_archive/point-releases/.

  • File a bug on ubuntu-website to have https://help.ubuntu.com/community/UbuntuHashes updated.

  • send the announcement mail

Release +1 day:

  1. restore the .manifest.full file on releases.ubuntu.com