March 12th, 2009, 12:00 UTC in #ubuntu-meeting.

Agenda

Action Items from March 5th, 2009

Current Items

Action items from this weeks meeting

Minutes

Action Item review was very quick, as most things were not updated. A number of the carry-overs were dropped in favour of regular roadmap discussion.

In Roadmap review, most of the remaining specs are either in-progress, or deferred. selection-of-arm-images will be trimmed to reflect actual progress made, and the missing bits pushed into a Karmic spec. Bug work was largely skipped in favour of enablement, although some progress was made. NSLU2 enablement was considered complete (although there remain bugs with encrypted LVM environments), and Babbage progress is well underway, with Oliver firmly in the lead.

The discussion on moving the IRC meeting was deferred, as attendance was low, and will be raised again at the next meeting.


Go back to MobileAndEmbedded.
CategoryUME

ARM/Meeting/2009/20090312 (last edited 2011-07-28 17:57:37 by pool-96-226-234-14)